Step 1: Centersection
jig |
|
11/10/07 Made part D and bondo'd to
table. |
|
11/11/07 Completed construction of the
jig. Now just waiting on the chapter kit to arrive. |
|
Step 2: Assembly of
foam parts |
|
11/18/07 Cut out all the foam for the
spar. |
|
Step 3: Interior Layups |
|
11/18/07 Built spar box. |
|
11/18/07 Long view. |
|
11/18/07 Cut out all LWA inserts.
|
|
11/19/07 Interior layups |
|
11/20/2007 Cut a 1-1/2" hole through CS6
& CS7, and installed a plastic grommet with 5ME. This is to allow
cables from the wings through the box. I wanted to do this now,
before the top (CS4) is installed and this becomes inaccessible. |
|
Step 4: Install the
forward face |
|
11/20/2007 CS4 is installed and held
tightly in place for cure. |
|
Step 5: Outside hard
points |
|
11/21/07 Cut out templates for spar caps. |
|
11/22/07 Removed spar from jig, preparing
for shear web layup. |
|
11/23/07 Sanding troughs for spar cap. |
|
11/23/07 I did this primarily with a
hacksaw, and came after with a sanding block to finish. |
|
11/23/07 Cutting the 1"x1/2" angles. |
|
11/23/07 Getting ready for the shear web
layup. You can see the aluminum inserts in place here as well. |
|
11/23/07 Probably the longest day yet,
but I wanted to get this done! |
|
Step 6: Spar cap layup |
|
12/8/07 The two spar caps are done. |
|
Step 7: Shoulder
harness blocks and outside layups |
|
12/30/07 Cut out four spruce pieces. |
|
12/30/07 This is where they'll go... |
|
12/30/07 ...just like that. |
|
12/30/07 Everything's ready for the 4-ply
UNI layup. |
|
Step 8: Hardpoint
reinforcement |
|
1/1/08 Positioning LWA2 & LWA3 |
|
1/1/08 Reinforcements are done and
curing. |
|
Step 9: Access for wing
attach and end layup |
|
Step 10: Installing in
the fuselage |
|